Page text
☰ Contents Close ✕ Conductor · Roadmap overlay Delivery sequence slots · waves · build-order overlay on the backlog. Filed 2026-06-20. An overlay, not a renumber. The plan-*.html pages are authoring order (when each gap got specced) — not delivery order. This groups them into dependency waves so an engineer builds foundations first. Plan IDs stay stable; waves are an overlay. Foundation audit · Wave 0 Wave gantt Slots per wave Dependency graph Arrows point from a slot to what it depends on. Filter by wave or status; click a node for detail. All slots Slot Title Wave Status Depends on

Made with Kuickr

Conductor delivery sequence — 15 slots, 4 waves