Conductor · Roadmap overlay

Delivery sequence

slots · waves · build-order overlay on the backlog. Filed 2026-06-20.

An overlay, not a renumber. The plan-*.html pages are authoring order (when each gap got specced) — not delivery order. This groups them into dependency waves so an engineer builds foundations first. Plan IDs stay stable; waves are an overlay.
Foundation audit · Wave 0
Wave gantt
Slots per wave
Dependency graph

Arrows point from a slot to what it depends on. Filter by wave or status; click a node for detail.

All slots
SlotTitleWaveStatusDepends on