Conductor · Roadmap overlay
slots · waves · build-order overlay on the backlog. Filed 2026-06-20.
plan-*.html pages are authoring order (when each gap got specced) — not delivery order. This groups them into dependency waves so an engineer builds foundations first. Plan IDs stay stable; waves are an overlay.Arrows point from a slot to what it depends on. Filter by wave or status; click a node for detail.
| Slot | Title | Wave | Status | Depends on |
|---|